Lena and Karla's finished ADU in West Covina, CA

Lena and Karla's Estate 800 ADU in West Covina, CA

Having our own space while still being close to family is as ideal as it gets.

Watch their 3-minute story

Helping a young couple start their future with independence, family support, and a beautifully designed ADU close to home.

My name’s Lina, and this is my mom, Carla. Since 2020, I had been seeing ADUs all over social media and became really interested in them. I was finishing college, engaged, and starting to think about the next chapter of life. I knew I didn’t want an apartment, and ADUs stayed on my mind the entire time.

I knew I didn’t want an apartment, and ADUs stayed on my mind the entire time.

For Carla, it was a little nerve-racking at first because it’s such a big project. But the more we talked about it, the more it made sense. It was a great idea for her to get her life started. We could each have our own space while still being there for each other.

It was a great idea for her to get her life started.

Lena and Karla, at 0:30 in their video

We first found Backyard Estates on Instagram and decided to stop by one of their open houses “just to look.” But walking through the home completely changed our perspective. Seeing the size, the finishes, and everything that came with the ADU made us realize this was definitely something we wanted to do.

Seeing the size, the finishes, and everything that came with the ADU made us realize this was definitely something we wanted to do.

Lena and Karla, at 0:53 in their video

We also knew that if we were going to move forward, it had to be with a company that handled everything. I’m not running to the city to do permits. That full-service approach made all the difference.

I’m not running to the city to do permits.

Lena and Karla, at 1:12 in their video

Meeting Tom and Adam gave us immediate confidence. Tom was informative, Adam was welcoming, and together they made us feel comfortable and cared for. Talking to Adam and Tom built trust immediately.

Talking to Adam and Tom built trust immediately.

Play from 1:28Lena and Karla, in their video

The construction process was surprisingly smooth. We expected noise and disruption, but it barely impacted daily life. Honestly, it did not interrupt our lives at all. And every Friday, we looked forward to the progress updates. I couldn’t wait to see the weekly updates and what was happening next.

I couldn’t wait to see the weekly updates and what was happening next.

What once felt overwhelming became simple because Backyard Estates handled every step. We don’t think we would have ever gotten through permitting on our own.

What once felt overwhelming became simple because Backyard Estates handled every step.

Now, we’re excited for what this ADU represents: independence, family, and a future together. Having our own space while still being close to family is as ideal as it gets. Soon Lina and her fiancé will begin building their life together here, with dreams of eventually raising children nearby.

Inside Lena and Karla's ADU
Inside Lena and Karla's ADU

Looking back, it truly feels like everything aligned perfectly.
It was meant to be.

The home they built

The Estate 800, as built
Size
800 sq ft
Rooms
2 bedrooms, 2 baths
Type
Detached, in the backyard
  • Luxury Vinyl Plank - Oyster
    FlooringOyster
  • Shaker Cabinets - White
    CabinetsWhite
  • Countertop - Calacatas Rocky
    CountertopsCalacatas Rocky
  • Ceramic Tile - Bright White
    Shower tileBright White
  • Cabinet Pulls - Satin Nickel
    HardwareSatin Nickel
  • Kitchen Faucet - Satin Nickel
    Kitchen faucetSatin Nickel

From first sketch to move-in day

Their real dates, from the first design meeting to the final inspection.

DesignAug 16 to Sep 26
6 weeks
City permitsOct 16 to Jan 12
13 weeks
ConstructionJanuary to March
11 weeks

City permits in West Covina

Lena and Karla
West Covina average

18 weeks faster than the 31-week average

Construction

Lena and Karla
West Covina average

27 weeks faster than the 38-week average

The eleven weeks of building

  1. Week 1: site prep
    Week 1Site prep
  2. Week 2: groundwork
    Week 2Groundwork
  3. Week 3: foundation and footings
    Week 3Foundation and footings
  4. Week 4: framing and rough-ins
    Week 4Framing and rough-ins
  5. Week 5: meps
    Week 5MEPs
  6. Week 6: insulation and drywall
    Week 6Insulation and drywall
  7. Week 7: exterior shell
    Week 7Exterior shell
  8. Week 8: exterior finish
    Week 8Exterior finish
  9. Week 9: cabinets
    Week 9Cabinets
  10. Week 10: countertops
    Week 10Countertops
  11. Week 11: interior and exterior finish
    Week 11Interior and exterior finish

Start where they started. A visit to our office.

See floor plans, finishes and what fits your lot, with the team that built Lena and Karla's home.

Book your free office visit

Or call or text (909) 500-0917

More stories in their own words