My name’s Lina, and this is my mom, Carla. Since 2020, I had been seeing ADUs all over social media and became really interested in them. I was finishing college, engaged, and starting to think about the next chapter of life. I knew I didn’t want an apartment, and ADUs stayed on my mind the entire time.
I knew I didn’t want an apartment, and ADUs stayed on my mind the entire time.
For Carla, it was a little nerve-racking at first because it’s such a big project. But the more we talked about it, the more it made sense. It was a great idea for her to get her life started. We could each have our own space while still being there for each other.
It was a great idea for her to get her life started.
We first found Backyard Estates on Instagram and decided to stop by one of their open houses “just to look.” But walking through the home completely changed our perspective. Seeing the size, the finishes, and everything that came with the ADU made us realize this was definitely something we wanted to do.
Seeing the size, the finishes, and everything that came with the ADU made us realize this was definitely something we wanted to do.
We also knew that if we were going to move forward, it had to be with a company that handled everything. I’m not running to the city to do permits. That full-service approach made all the difference.
I’m not running to the city to do permits.
Meeting Tom and Adam gave us immediate confidence. Tom was informative, Adam was welcoming, and together they made us feel comfortable and cared for. Talking to Adam and Tom built trust immediately.
Talking to Adam and Tom built trust immediately.
The construction process was surprisingly smooth. We expected noise and disruption, but it barely impacted daily life. Honestly, it did not interrupt our lives at all. And every Friday, we looked forward to the progress updates. I couldn’t wait to see the weekly updates and what was happening next.
I couldn’t wait to see the weekly updates and what was happening next.
What once felt overwhelming became simple because Backyard Estates handled every step. We don’t think we would have ever gotten through permitting on our own.
What once felt overwhelming became simple because Backyard Estates handled every step.
Now, we’re excited for what this ADU represents: independence, family, and a future together. Having our own space while still being close to family is as ideal as it gets. Soon Lina and her fiancé will begin building their life together here, with dreams of eventually raising children nearby.
Having our own space while still being close to family is as ideal as it gets.
Looking back, it truly feels like everything aligned perfectly. It was meant to be.
Designed to feel like home.
Neff is our Estate 800, built as designed.
Project Timeline Overview
6 weeks
Plans13 weeks
Permits11 weeks
ConstructionSite work on this lot
No surprises. Here’s why.
Our Formal Property Analysis found all of this before they signed.
Step 1 of 2
Found before we started
Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.
The existing water meter, at the FPA site visit, Jul 14, 2025
Water line upgraded to a 1-inch meter
- What we found during the FPA
- The water meter was too small to serve two homes.
- How finding it early helped
- Sizing the new meter at the start let the water district swap it while the ADU was still being built.
- What it meant for this homeowner
- Good water pressure in both homes, with no wait on the water district at move-in.
The existing panel, at the FPA site visit, Jul 14, 2025
Electrical load calculations
- What we found during the FPA
- The electrical panel had to power two homes.
- How finding it early helped
- Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
- What it meant for this homeowner
- Power for both homes from day one, with no wait on the utility.
A sewer cleanout at one of our jobs
Sewer scope
- What we found during the FPA
- The existing sewer line needed a camera check before the ADU could tie in.
- How finding it early helped
- The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
- What it meant for this homeowner
- A sewer line ready for two homes, and a finished yard left alone.
A fire hydrant at one of our jobs
Fire flow test
- What we found during the FPA
- The fire department needed a flow test of the nearest hydrant.
- How finding it early helped
- The result tells us right away if the fire department will require sprinklers, which changes the water line, the ceilings and the permit. So all of it was settled before the design.
- What it meant for this homeowner
- Plans that met the fire department’s rules from day one, with no late redesign.
Sprinkler lines in another ADU we built
Fire sprinklers
- What we found during the FPA
- The fire department required sprinklers in the ADU.
- How finding it early helped
- Planning sprinklers from day one meant the water line, meter and ceilings were sized for them, and the fire department reviewed one complete design.
- What it meant for this homeowner
- No redesign after approval, and sprinklers that fit cleanly into the finished rooms.
City permits and fees
Already included in every price, in every city we build in.
Added for this lot
- Impact feesThis ADU is 800 sq ft. State law lets cities charge impact fees on ADUs 750 sq ft and up.
- SurveyA licensed survey of the lot’s lines and levels, so the plans sit exactly where they should.
- Encroachment permitA city permit to work in the street or sidewalk to reach the utilities.
Step 2 of 2
Finished to match the house
So the ADU looks like it belongs with the house.
- SidingThe same style as the house, so they look like a set.
Our team
Your team, from first visit to move-in.
One team. Every step.
Plan
Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
Permits
Elsa TomasProject AdminYour updates and documents, in one place.
Build
Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
Jose CervantesProject ManagerRuns your schedule from permit to move-in.
Every step
Adam StewartPresident & FounderStands behind every build.
Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.
- Sewer line conditionLine checked before the tie-inFound
- Water meter sizeA bigger meter, set during the buildFound
- Electrical panel sizePower for both homes, planned earlyFound
- Fire department rulesFire rules met in the first designFound
Also checked
- Zoning and setbacks
- Height and size limits
- Slope and drainage
- Soil and foundation
- Utility run lengths
And 240+ more on every lot
- What your lot needs
- A buildable solution
- A proposal with no surprises
$500, fully credited toward your build
Not ready? Start with a free office visit
Finishes in this home
Designed with purpose, finished with care.
Every finish and fixture is selected with intention.

Flooring
Oyster

Cabinets
White

Countertops
Calacatas Rocky

Shower tile
Bright White

Hardware
Satin Nickel

Kitchen faucet
Satin Nickel