ADU Builder · Los Angeles County

ADU Builder in Pico Rivera, California

Custom-built ADUs for Pico Rivera homes — from Smith Park to Rivera, designed for multigenerational living on the lots between the San Gabriel River and Rio Hondo.

4.9 · 26 Google reviews
  • All-in pricing
  • Permits handled
  • Design & build in-house
ADU built by Backyard Estates in Pico Rivera, CaliforniaBuilt in Pico Rivera
0ADUs built in Pico Rivera
  • 0+across Los Angeles County
  • 0+completed since 2020

Real local proof

ADUs we’ve built in & around Pico Rivera

40+ completed ADUs across Los Angeles County — including projects near Pico Rivera. Tap any for its floor plan, finishes, and timeline.

Loved by neighbors

What Pico Rivera homeowners say

Juan

The best part was being able to sleep well at night, knowing I chose the right team.

JuanHomeowner · Los Angeles County

Watch their full story

The opportunity

What an ADU returns in Pico Rivera

Turn underused backyard into monthly income and lasting value.

Estimated monthly rent

$0$0

per month, in Pico Rivera

Typical value added

$0k$0k

added to your property

No hassle, just cash flow — we handle the design, permits, and construction end to end, so your Pico Rivera backyard starts paying you back.

Estimates only — your exact rent, value, and price come from a free property analysis.

Your next step

See what’s possible at your Pico Rivera address

Drop in your address and we’ll show you which ADUs fit your lot, what they’d cost all-in, and what they could earn — no pressure, no obligation.

  • Free, no-obligation
  • Specific to your Pico Rivera parcel
Prefer to talk? Call (909) 500-0917
Timeline · Pico Rivera

3.5months to a finished ADU.

The Pico Rivera industry average is 15.3 months — we’re about faster.

Backyard Estates3.5 mo105 days
Industry average15.3 mo458 days
PermitsConstruction

The biggest gap is construction — the industry averages 283 days; we clear it in 40.

Permits & fees

Red tape in Pico Rivera, handled

Permitting an ADU touches a dozen departments and a stack of fees. We run every one — and it’s already in your fixed, all-in price.

Reviewed by the City of Pico Rivera Planning Division

What California’s statewide ADU law means for your Pico Rivera property:

  • Pico Rivera reviews code-compliant ADU applications ministerially — no public hearing — with a 60-day decision window required under current California law.
  • State law guarantees an 800 sq ft ADU by-right with 4-foot side and rear setbacks; most Pico Rivera lots can support a detached unit up to 1,200 sq ft, and attached ADUs up to 50% of the main house.
  • No additional off-street parking can be required when the ADU is within a half-mile walk of transit or when a converted garage's spaces are eliminated.
  • No owner-occupancy requirement applies to ADUs through January 1, 2030; note that an LA County Sanitation District connection-fee receipt is required before the city issues your building permit.

Every city fee — already in your price

No surprise municipal bills. We absorb every Pico Rivera permit and city fee into one fixed, all-in price.

  • Permit & plan-check fees
  • School district fees
  • Utility hookups
  • Fire & public works
  • We run all ~11 city & county departments — plan check, building, fire, public works, utilities, and school fees.
  • Our Formal Property Analysis verifies 0+ property & city items — fire sprinklers, school & plan-check fees, lot coverage, Title 24 — before we build.

Specific setbacks, fees, and overlay rules are confirmed for your exact parcel during your free Formal Property Analysis.

Local know-how

Why homeowners build in Pico Rivera

Pico Rivera sits on rich alluvial flats between the San Gabriel River and the Rio Hondo, a city formed in 1958 when the two long-standing farm communities of Pico — named for Pío Pico, California's last Mexican governor — and Rivera voted to incorporate as one. That history left behind a town of deep, flat, generously sized residential lots: postwar single-family homes on level parcels with real backyards, alleys, and detached garages. It's exactly the kind of property where a detached ADU, garage conversion, or attached suite fits naturally without crowding the main house — and where Backyard Estates, just up the 60 in Upland, can design and build close to home.

What drives ADU demand here is family. Pico Rivera is one of the most family-rooted, multigenerational communities in southeast LA County, and homeowners keep telling us the same thing: they want grown kids, aging parents, or a caretaker close by without anyone moving away. A backyard casita or in-law suite lets three generations share one address while keeping their own front door. Others build to create rental income in a tight Greater Los Angeles housing market, turning an underused yard or 1950s garage into a unit that helps carry the mortgage.

We design each ADU to the realities of a Pico Rivera lot — alley access in neighborhoods like Rivera and Pico, mature trees and existing garages in Smith Park, and the city's flat grades that make foundations and utility runs straightforward. Because we're a design-build contractor, one team handles your floor plan, structural engineering, Title 24 energy compliance, the Planning Division submittal, and construction through final inspection. You get 3D renderings before we break ground and a single project manager from permit to keys, so building in your own backyard feels less like a gamble and more like a finished home you can picture from day one.

Building throughout Pico Rivera

Smith ParkRiveraPicoNorth Pico Rivera

Good to know

Pico Rivera ADU questions, answered

Most all-in projects (design, permits, and construction) land between roughly $150,000 and $400,000+, driven mainly by size, type, and finishes — a garage conversion costs far less than a new detached unit. Pico Rivera's flat, level lots help keep site and foundation work predictable. We give you a fixed, itemized proposal up front so there are no surprises.

The City of Pico Rivera Planning Division, part of the Community & Economic Development Department at 6615 Passons Boulevard, reviews ADU applications for zoning consistency, and Building & Safety handles plan check. Submittals go through the city's online permit portal. We prepare the full package and manage plan-check corrections so the ministerial 60-day clock works in your favor.

Yes. You can rent a permitted ADU, though rentals must be for terms longer than 30 days, so short-term vacation rentals aren't allowed. There's no owner-occupancy requirement through January 1, 2030, making a backyard unit a strong long-term rental option in a high-demand part of LA County.

Keep exploring

Nearby areas we build in

Get Started

Build your ADU in Pico Rivera

Drop in your address and we'll show you what's possible on your lot, what it costs all-in, and what it could earn — no pressure.

See what’s possible