We decided to build an ADU because we wanted the best of both worlds: to stay close to our children and grandchildren while still having our own private space. As we’ve gotten older, we realized how important it is to have family nearby without giving up our independence.

it became clear that being close to family was where we truly wanted to be.

We had actually been considering an ADU for almost four years. At one point, we decided against it and moved to South Carolina. But after living there, we realized just how much we missed our kids and grandkids. We found ourselves flying back to California three or four times a year, and after a few health scares, it became clear that being close to family was where we truly wanted to be.

Our office visit with Backyard Estates made the decision easy.

Our office visit with Backyard Estates made the decision easy. We met the entire team, and the conversation never felt like a sales pitch. Everything was open for discussion. If something wasn't the right fit, they talked through alternatives until we found the right solution.

We needed somebody that would take care of the process from beginning to end.

By the time we walked out of that meeting, we had all the numbers and knew exactly where we stood. There was no guessing, no hidden surprises, and no uncertainty.

Week one, this would happen. Week two, this would happen. Week three... and that's exactly how things happened.

Because we were living across the country while the ADU was being built, trust was everything. We needed somebody that would take care of the process from beginning to end. Backyard Estates explained exactly what would happen each week—and then delivered exactly as promised. Week one, this would happen. Week two, this would happen. Week three... and that's exactly how things happened.

The construction process was incredibly easy for us because they handled everything.

The construction process was incredibly easy for us because they handled everything. Even from thousands of miles away, we always felt confident that our project was moving forward exactly as planned.

Our advice is simple: do your homework, choose a company you trust, and look at the quality of their work.

If you're considering building an ADU, our advice is simple: do your homework, choose a company you trust, and look at the quality of their work. For us, that company was Backyard Estates.

If I ever had to do this again, I would definitely use Backyard Estates.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Hillward started as our Estate 800 and was customized for this home.

Project Timeline Overview

16 weeks

Plans

11 weeks

Permits

9 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Exterior Scratch & Roofing
Exterior Scratch & Roofing
Week 7
Cabinets & Countertops
Cabinets & Countertops
Week 8
Interior & Exterior Finishes
Interior & Exterior Finishes
Week 9
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Attached ADU: Opening the house wall at another ADU we built

Opening the house wall at another ADU we built

Attached ADU

What we found during the FPA
The ADU attaches to the main house.
How finding it early helped
Planning the connection early let us design the shared wall, roofline and fire separation together.
What it meant for this homeowner
Two homes that look like one outside and stay safely separate inside.
Longer utility runs (126 feet): The utility trench, Apr 6, 2026

The utility trench, Apr 6, 2026

Longer utility runs (126 feet)

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Electrical load calculations: The existing panel, at the FPA site visit, Aug 13, 2025

The existing panel, at the FPA site visit, Aug 13, 2025

Electrical load calculations

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
Sewer scope: The sewer cleanout, at the FPA site visit, Aug 13, 2025

The sewer cleanout, at the FPA site visit, Aug 13, 2025

Sewer scope

What we found during the FPA
The existing sewer line needed a camera check before the ADU could tie in.
How finding it early helped
The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
What it meant for this homeowner
A sewer line ready for two homes, and a finished yard left alone.
  • Drainage lines and grading: An area drain beside another ADU we built

    An area drain beside another ADU we built

    Drainage lines and grading

    Drain lines and grading that carry rainwater away from both homes.

  • Concrete cut and poured back: Pouring concrete, Apr 13, 2026

    Pouring concrete, Apr 13, 2026

    Concrete cut and poured back

    Concrete cut for the trench, then poured back.

  • Demo and haul-away: Hauling dirt to the truck at one of our jobs

    Hauling dirt to the truck at one of our jobs

    Demo and haul-away

    Extra soil and debris hauled off the lot.

  • Drywall in the garage

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • GuttersGutters that keep rainwater away from both homes.
  • SidingThe same style as the house, so they look like a set.
  • TrimThe same window and door trim as the house.

Plus the upgrades they chose

  • A second exterior doorA second door to the outside, with its own light.
  • Kitchen islandA kitchen island for prep and seating.
  • Range hood over the stove
  • Microwave built into the island

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Hillward, our architect and engineers checked 250+ things before anything was designed.

Hillward’s FPA250+ checks
  • Distance to the house and lot linesShared wall and roof designed as oneFound
  • Sewer line conditionLine checked before the tie-inFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Soil and foundation
  • Water meter size
  • Fire department rules

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Duchess

    Flooring

    Duchess

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Countertop - Fantasy Gold

    Countertops

    Fantasy Gold

  • Cabinet Pulls - Brushed Gold

    Hardware

    Brushed Gold

  • Kitchen Faucet - Brushed Gold

    Kitchen faucet

    Brushed Gold

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.