My name is Ed Cadwell. For a couple of years, my daughter encouraged me to look into building an ADU. At first, I resisted. Life was good, and I wasn’t sure it was necessary. But as friends began facing situations where they needed to move in with family or have family move in with them, I started thinking more seriously about the future.

You don’t want to build this yourself—it’s going to take forever.

With an engineering background, I decided to design the ADU myself. I created floor plans, worked through setbacks, and even had my architect niece review the drawings. But after looking at everything, she told me, You don’t want to build this yourself—it’s going to take forever.

That’s when my daughter connected us with Backyard Estates.

When we met Adam and Tom, something immediately clicked. Sometimes you just connect with people, and I connected with Tom. His construction experience gave me confidence that they could actually deliver what they promised.

Sometimes you just connect with people, and I connected with Tom.

Originally, my plan was to act as my own general contractor, but everyone kept telling me the same thing: it would take years. My biggest concern was getting it done quickly. When Tom looked at my plans, he confidently said, It’ll be twelve weeks.

Honestly, I didn’t think that was possible.

When Tom looked at my plans, he confidently said, It’ll be twelve weeks.

Yet here we are in the eleventh week since groundbreaking, and the progress has been remarkable. We were actually out of town when construction started, but I monitored everything through security cameras and was amazed. I was just amazed at how quickly they got the footings dug, ready to pour, and moved everything forward.

I was just amazed at how quickly they got the footings dug, ready to pour, and moved everything forward.

What I appreciated most was that Backyard Estates embraced my vision. This wasn’t one of their standard plans—it was something I had designed myself. Their architect took my ideas, refined them, and helped make the design even better. They were willing to do something different and work with our custom design.

They were willing to do something different and work with our custom design.

Soon, we’ll have our own private space while still being close to our daughter, son-in-law, and grandchildren. That balance of independence and family support is exactly what we wanted.

Backyard Estates just has a system that works.

For anyone considering an ADU, my advice is simple: Having someone who does ADUs all the time is a huge advantage. Whether you choose one of their plans or bring your own design like I did, Backyard Estates just has a system that works. I would strongly recommend them to anyone considering building an ADU.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Essex started as our Estate 950 and was customized for this home.

Project Timeline Overview

14 weeks

Plans

21 weeks

Permits

10 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Concrete Pour
Concrete Pour
Week 4
Framing & Rough-Ins
Framing & Rough-Ins
Week 5
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 6
Insulation & Drywall
Insulation & Drywall
Week 7
Exterior Finish
Exterior Finish
Week 8
Cabinets & Countertops
Cabinets & Countertops
Week 9
Interior Touch-ups
Interior Touch-ups
Week 10
Final Inspection
Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Attached to the house with a tied-in roof: Opening the house wall for the connection, Mar 11, 2026

Opening the house wall for the connection, Mar 11, 2026

Attached to the house with a tied-in roof

What we found during the FPA
The ADU attaches to the main house.
How finding it early helped
Planning the connection early let us design the shared wall, roofline and fire separation together.
What it meant for this homeowner
Two homes that look like one outside and stay safely separate inside.
Electrical panel relocated: The existing panel, at the FPA site visit, May 5, 2025

The existing panel, at the FPA site visit, May 5, 2025

Electrical panel relocated

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
Longer utility runs (87 feet): The utility trench, Mar 11, 2026

The utility trench, Mar 11, 2026

Longer utility runs (87 feet)

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Soils report: Digging the foundation at another ADU we built

Digging the foundation at another ADU we built

Soils report

What we found during the FPA
The ground needed an engineer’s soil test before the foundation could be designed.
How finding it early helped
The soil report told our engineer how much weight this ground can hold, so the footings and steel were designed for this exact lot.
What it meant for this homeowner
A foundation built for this ground, with no redesign at inspection.
Sewer scope: A sewer cleanout at one of our jobs

A sewer cleanout at one of our jobs

Sewer scope

What we found during the FPA
The existing sewer line needed a camera check before the ADU could tie in.
How finding it early helped
The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
What it meant for this homeowner
A sewer line ready for two homes, and a finished yard left alone.
Fire flow test: A fire hydrant at one of our jobs

A fire hydrant at one of our jobs

Fire flow test

What we found during the FPA
The fire department needed a flow test of the nearest hydrant.
How finding it early helped
The result tells us right away if the fire department will require sprinklers, which changes the water line, the ceilings and the permit. So all of it was settled before the design.
What it meant for this homeowner
Plans that met the fire department’s rules from day one, with no late redesign.
  • Concrete cut and poured back (351 sq ft): Concrete cut for the trench, Mar 11, 2026

    Concrete cut for the trench, Mar 11, 2026

    Concrete cut and poured back (351 sq ft)

    Concrete cut for the trench, then poured back.

  • Trees and shrubs removed: Removing a tree at one of our jobs

    Removing a tree at one of our jobs

    Trees and shrubs removed

    Trees and old yard items cleared for the ADU.

  • New 6-foot slider door on the main house

City permits and fees

Already included in every price, in every city we build in.

StepWho we work withFees we pay
Plan reviewPlanning, Building, Engineering, City / County Fire, CA ADU LawPlan-check, fire, corrections review, state compliance
UtilitiesPublic Works, Water, Electric Provider, WasteWater, sewer and electric connection and capacity
PermitSchool Districts, RecorderSchool, address, notarization, building, permit pull
InspectionsBuildingInspection

Added for this lot

  • Impact feesThis ADU is 895 sq ft. State law lets cities charge impact fees on ADUs 750 sq ft and up.
  • SurveyA licensed survey of the lot’s lines and levels, so the plans sit exactly where they should.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • TrimThe same window and door trim as the house.

Plus the upgrades they chose

  • Tile floor for the roll-in showerA custom tile shower.
  • Corner cabinet with a lazy susan

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Essex, our architect and engineers checked 250+ things before anything was designed.

Essex’s FPA250+ checks
  • Distance to the house and lot linesShared wall and roof designed as oneFound
  • Soil and foundationFootings designed for this groundFound
  • Sewer line conditionLine checked before the tie-inFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound
  • Fire department rulesFire rules met in the first designFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Water meter size

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Oyster

    Flooring

    Oyster

  • Shaker Cabinets - White

    Cabinets

    White

  • Countertop - Calacatas River

    Countertops

    Calacatas River

  • Cabinet Pulls - Satin Nickel

    Hardware

    Satin Nickel