Greentree ADU

2 Bed
2 Bath
749 sqft
detached
Testimonial video
Gallery image
Gallery image
View gallery
View All
Ken

Ken

HOMEOWNER

Ken

Ken

HOMEOWNER

For a young couple starting out, living in this area would be unaffordable. Building an ADU became a way for them to stay in Norco, enjoy the community, and still be near us. My name is Ken Mortensen, and this whole project began as a family discussion.

Building an ADU became a way for them to stay in Norco, enjoy the community, and still be near us.

The first time Sandy and I met Adam was at an open house, and his enthusiasm made us feel comfortable about what we were considering. Being able to walk through the homes helped us understand the space. Going from 1,800 sq ft down to 749 sq ft was intimidating, but the open houses showed us how well the space could be used—it didn’t feel small at all.

The open houses showed us how well the space could be used

A major question for us was experience in Norco. Some companies opted out, but Adam and Tom had built ADUs here before and were willing to take on our project. Backyard Estates came out for an initial survey, helping us understand the regulations and locating our utilities. They even confirmed that we didn’t need a sewage pump, which was a huge relief.

They worked seamlessly together

I was really impressed with the subcontractors. They worked seamlessly together, familiar with each other and committed to quality. Walking through open houses and seeing the finishes also reassured us that the finishes weren’t going to feel small or cheap—they matched the quality of our own home.

The finishes weren’t going to feel small or cheap—they matched the quality of our own home.

But above everything, the care that occurred in the building of the house stood out. Dusty, the subcontractors—everyone involved seemed to genuinely care about the work. They wanted to build a solid home for us, on time and for the right price.

Everything aligned: the quality, the cost, the experience.

In the end, everything aligned: the quality, the cost, the experience. It was simply a perfect fit for what we wanted.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Greentree started as our Estate 750+ and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Interior & Exterior Finish
Interior & Exterior Finish
Week 7
Cabinets & Countertops
Cabinets & Countertops
Week 8
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Longer utility runs (106 feet): Utility lines in the trench at one of our jobs

Utility lines in the trench at one of our jobs

Longer utility runs (106 feet)

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Fire sprinklers: Sprinkler lines in another ADU we built

Sprinkler lines in another ADU we built

Fire sprinklers

What we found during the FPA
The fire department required sprinklers in the ADU.
How finding it early helped
Planning sprinklers from day one meant the water line, meter and ceilings were sized for them, and the fire department reviewed one complete design.
What it meant for this homeowner
No redesign after approval, and sprinklers that fit cleanly into the finished rooms.
Sewer scope: A sewer cleanout at one of our jobs

A sewer cleanout at one of our jobs

Sewer scope

What we found during the FPA
The existing sewer line needed a camera check before the ADU could tie in.
How finding it early helped
The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
What it meant for this homeowner
A sewer line ready for two homes, and a finished yard left alone.
  • A separate water meter for the ADU: The existing water meter, at the FPA site visit

    The existing water meter, at the FPA site visit

    A separate water meter for the ADU

    A water meter of its own for the ADU, separate from the house.

  • A separate electric meter for the ADU: Electrical work outside another ADU we built

    Electrical work outside another ADU we built

    A separate electric meter for the ADU

    An electric meter of its own for the ADU, separate from the house.

  • Drainage flow lines graded: An area drain beside another ADU we built

    An area drain beside another ADU we built

    Drainage flow lines graded

    Drain lines and grading that carry rainwater away from both homes.

  • Concrete cut and poured back (174 sq ft): Concrete cut for the trench at one of our jobs

    Concrete cut for the trench at one of our jobs

    Concrete cut and poured back (174 sq ft)

    Concrete cut for the trench, then poured back.

City permits and fees

Already included in every price, in every city we build in.

StepWho we work withFees we pay
Plan reviewPlanning, Building, Engineering, City / County Fire, CA ADU LawPlan-check, fire, corrections review, state compliance
UtilitiesPublic Works, Water, Electric Provider, WasteWater, sewer and electric connection and capacity
PermitSchool Districts, RecorderSchool, address, notarization, building, permit pull
InspectionsBuildingInspection

Added for this lot

  • Encroachment permitA city permit to work in the street or sidewalk to reach the utilities.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Tile roofTile to match the house, on a roof built to hold it.
  • SidingThe same style as the house, so they look like a set.
  • TrimThe same window and door trim as the house.

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Greentree, our architect and engineers checked 250+ things before anything was designed.

Greentree’s FPA250+ checks
  • Sewer line conditionLine checked before the tie-inFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Fire department rulesSprinklers planned from day oneFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Soil and foundation
  • Water meter size
  • Electrical panel size

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Malibu

    Flooring

    Malibu

  • Shaker Cabinets - White

    Cabinets

    White

  • Countertop - Fairy White

    Countertops

    Fairy White

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Cabinet Pulls - Matte Black

    Hardware

    Matte Black

  • Kitchen Faucet - Satin Nickel

    Kitchen faucet

    Satin Nickel

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.