Eastwood ADU

1 Bed
1 Bath
592 sqft
attached
Testimonial video
Gallery image
Gallery image
View gallery
View All
Katie and Paula

Katie and Paula

HOMEOWNER

Katie and Paula

Katie and Paula

HOMEOWNER

My name’s Katie. And I’m Paula. We decided to build an ADU because our current home didn’t have a downstairs bedroom or bathroom, and we wanted to create a comfortable, private space. After selling our homes, the goal became clear—to build a suite where we could live close together while still having independence.

The goal became clear. To build a suite where we could live close together while still having independence.

We actually discovered Backyard Estates in a pretty unexpected way. Dusty came into my husband’s work, and we noticed his shirt. That led us to visit an open house—and we instantly fell in love with the quality of the work.

We instantly fell in love with the quality of the work

From the very first meeting with Adam and Tom, everything felt easy. They were so easygoing… they made us feel really welcomed. They pulled up our house on the big screen and walked us through every step of the process. There was no pressure—just honest guidance.

They were so easygoing… they made us feel really welcomed.

What really stood out was how well they listened. They helped us utilize the space in a really good way. They took our ideas and turned them into a layout that fit perfectly with our home. The result? A beautiful design with an amazing mountain view, a charming kitchen, and a layout that just feels right.

They helped us utilize the space in a really good way.

Construction was smooth and moved quickly. Once it started, every day someone was doing their part, and we received weekly updates through the app. If we ever had questions, someone was always available. It created a worry-free environment.

The finished result has exceeded expectations. Everyone who visits is amazed at how well it blends with the main house. But more importantly, it’s changed how we live.

If we ever had questions, someone was always available. It created a worry-free environment.

She gets the best of both worlds—her own ADU while still being close to family.

It’s brought us closer together, created comfort, and added so much joy to our daily lives. Instead of being by myself, now I’m living with my best friend.

Instead of being by myself, now I’m living with my best friend.
ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Eastwood started as our Estate 600 and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Drywall
Drywall
Week 6
Exterior Scratch
Exterior Scratch
Week 7
Cabinets & Countertops
Cabinets & Countertops
Week 8
Interior & Exterior Finish
Interior & Exterior Finish
Week 9
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.
Inspired by this ADU?

Designed specifically for your property

With years of experience building ADUs across Southern California, we begin by carefully reviewing your property, local requirements, and long-term goals. From there, we outline realistic options so you can move forward with clarity and confidence.

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Shaker Cabinets - Misty Gray

    Cabinets

    Misty Gray

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Countertop - Calacatas River

    Countertops

    Calacatas River

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Cabinet Pulls - Matte Black

    Hardware

    Matte Black

  • Kitchen Faucet - Matte Black

    Kitchen faucet

    Matte Black

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.