ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Glen Arden started as our Estate 950 and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Footings
Footings
Week 3
Foundation
Foundation
Week 4
Floor Framing
Floor Framing
Week 5
Subfloor
Subfloor
Week 6
Framing
Framing
Week 7
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 8
Rough-Ins
Rough-Ins
Week 9
Insulation & Drywall
Insulation & Drywall
Week 10
Exterior Scratch
Exterior Scratch
Week 11
Roofing
Roofing
Week 12
Exterior Stucco
Exterior Stucco
Week 13
Cabinets & Countertops
Cabinets & Countertops
Week 14
Exterior Finish & Final Inspection
Exterior Finish & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Utility runs extended 50 feet: Digging the utility trench, Jun 10, 2026

Digging the utility trench, Jun 10, 2026

Utility runs extended 50 feet

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Electrical load calculations: At the FPA site visit, Apr 30, 2025

At the FPA site visit, Apr 30, 2025

Electrical load calculations

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
  • A separate electric meter for the ADU: Electrical work outside another ADU we built

    Electrical work outside another ADU we built

    A separate electric meter for the ADU

    An electric meter of its own for the ADU, separate from the house.

  • A separate water meter for the ADU: A water meter at one of our jobs

    A water meter at one of our jobs

    A separate water meter for the ADU

    A water meter of its own for the ADU, separate from the house.

  • Raised foundation with a crawl space: Footings for the raised foundation, Jun 27, 2026

    Footings for the raised foundation, Jun 27, 2026

    Raised foundation with a crawl space

  • Earthwork and grading: Grading the lot, Jun 16, 2026

    Grading the lot, Jun 16, 2026

    Earthwork and grading

  • Old patio taken out: Breaking up old concrete at one of our jobs

    Breaking up old concrete at one of our jobs

    Old patio taken out

    An old patio taken out and hauled away.

  • Shrubs removed: Removing a tree at one of our jobs

    Removing a tree at one of our jobs

    Shrubs removed

    Trees and old yard items cleared for the ADU.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Siding, trim and porch shiplap to match the houseThe same style as the house, so they look like a set.
  • Exterior shutters

Plus the upgrades they chose

  • A second exterior doorA second door to the outside, with its own light.
  • Kitchen island with outletsA kitchen island for prep and seating.
  • Roll-in tile shower and tile bath floorA custom tile shower.
  • Extra windows
  • Kitchen cabinets 4 inches taller
  • ADA toilet with two flush buttons
  • Quarter-inch glass windows
  • Cat 6 network wiring throughout

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Glen Arden, our architect and engineers checked 250+ things before anything was designed.

Glen Arden’s FPA250+ checks
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Soil and foundation
  • Sewer line condition
  • Water meter size
  • Fire department rules

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Duchess

    Flooring

    Duchess

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Kitchen Farmhouse Sink

    Upgrade

    Kitchen Farmhouse Sink