Estate 950 ADU in Covina, CA – photo 1 of 32
Estate 950 ADU in Covina, CA – photo 2 of 32
Estate 950 ADU in Covina, CA – photo 3 of 32
View all 32 photos of the Glen Arden ADU
View All
Dan and Jocelyn

Dan and Jocelyn

HOMEOWNER

Dan and Jocelyn

Dan and Jocelyn

HOMEOWNER

My name is Jocelyn Vilter, and for years, we had this big backyard that we weren't really using for anything. I used to jokingly call it the vast wasteland. But when our son and his partner, Emma, needed a place of their own, we realized that unused space could become something much more meaningful.

We realized that unused space could become something much more meaningful.

They had been living with us in our four-bedroom house, and although we loved having them close, things were starting to feel a little crowded. They needed their own private space, too. Building an ADU seemed like the perfect way to give them their independence while keeping our family together on the same property.

Building an ADU seemed like the perfect way to give them their independence while keeping our family together.

We started researching three or four different companies, and that's when we discovered Backyard Estates through one of their open houses. We really enjoyed visiting the homes, seeing the different design choices, and getting a feel for the people behind the company.

What ultimately convinced us wasn't just the quality of the homes. Picking Backyard Estates was based a lot on the personalities of the people who work there. Everybody has been so nice and very straightforward.

From the very beginning, Adam was honest about what we could expect. He explained that permitting in Los Angeles County could take longer than we might hope. And he was right! But we appreciated that he told us upfront instead of making promises he couldn't keep.

At least he didn't try to cover that up.

Picking Backyard Estates was based a lot on the personalities of the people who work there. Everybody has been so nice and very straightforward.

Once we worked through the financing and paperwork, we felt comfortable putting the project in Backyard Estates' hands. We had actually considered managing the construction ourselves, but being retired, we realized that wasn't how we wanted to spend our time.

I kind of feel like we just turned ourselves over to them.

They handled the paperwork, coordinated with the county and inspectors, and managed the subcontractors. Instead of having to figure everything out ourselves, we had a team taking care of the process.

I kind of feel like we just turned ourselves over to them.

One of the most memorable moments was the first day of construction. Watching our entire backyard get cleared was something we'd never experienced before. Suddenly, the space we'd looked at for years was completely transformed.

They handled the paperwork, coordinated with the county and inspectors, and managed the subcontractors

It was terrifying and exciting.

I remember watching Dusty operate the excavator, pulling everything out and filling a huge dumpster. It was quite an impressive sight!

Throughout construction, Dusty was especially wonderful to work with. Whenever I had a question or concern, he took the time to listen and help find a solution.

Dusty really was great because he listened to me and took care of virtually all of my concerns. It was very valuable.

Now that the ADU is essentially finished and our son and Emma are moving in, I feel both happy and relieved. It's wonderful knowing they'll finally have their own home, right here on our property.

Dusty really was great because he listened to me and took care of virtually all of my concerns. It was very valuable.

There's even a funny little feeling of disappointment now that construction is ending. After getting used to seeing crews arrive and watching something new happen almost every day, it's strange to think that the backyard will be quiet again!

I would certainly recommend Backyard Estates to any of my friends.

But most importantly, we took a piece of property that wasn't serving much of a purpose and turned it into a home for our family.

Looking back, we're very happy with our decision. I've already brought several friends to Backyard Estates' open houses because I want them to see what's possible.

I would certainly recommend Backyard Estates to any of my friends.

And if we ever had the opportunity to do another project, the decision would be easy.

I wouldn't hesitate to go with this company again.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Glen Arden started as our Estate 950 and was customized for this home.

Project Timeline Overview

13 weeks

Plans

42 weeks

Permits

14 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Footings
Footings
Week 3
Foundation
Foundation
Week 4
Floor Framing
Floor Framing
Week 5
Subfloor
Subfloor
Week 6
Framing
Framing
Week 7
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 8
Rough-Ins
Rough-Ins
Week 9
Insulation & Drywall
Insulation & Drywall
Week 10
Exterior Scratch
Exterior Scratch
Week 11
Roofing
Roofing
Week 12
Exterior Stucco
Exterior Stucco
Week 13
Cabinets & Countertops
Cabinets & Countertops
Week 14
Exterior Finish & Final Inspection
Exterior Finish & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Utility runs extended 50 feet: Digging the utility trench, Jun 10, 2026

Digging the utility trench, Jun 10, 2026

Utility runs extended 50 feet

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Electrical load calculations: At the FPA site visit, Apr 30, 2025

At the FPA site visit, Apr 30, 2025

Electrical load calculations

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
  • A separate electric meter for the ADU: Electrical work outside another ADU we built

    Electrical work outside another ADU we built

    A separate electric meter for the ADU

    An electric meter of its own for the ADU, separate from the house.

  • A separate water meter for the ADU: A water meter at one of our jobs

    A water meter at one of our jobs

    A separate water meter for the ADU

    A water meter of its own for the ADU, separate from the house.

  • Raised foundation with a crawl space: Footings for the raised foundation, Jun 27, 2026

    Footings for the raised foundation, Jun 27, 2026

    Raised foundation with a crawl space

  • Earthwork and grading: Grading the lot, Jun 16, 2026

    Grading the lot, Jun 16, 2026

    Earthwork and grading

  • Old patio taken out: Breaking up old concrete at one of our jobs

    Breaking up old concrete at one of our jobs

    Old patio taken out

    An old patio taken out and hauled away.

  • Shrubs removed: Removing a tree at one of our jobs

    Removing a tree at one of our jobs

    Shrubs removed

    Trees and old yard items cleared for the ADU.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Siding, trim and porch shiplap to match the houseThe same style as the house, so they look like a set.
  • Exterior shutters

Plus the upgrades they chose

  • A second exterior doorA second door to the outside, with its own light.
  • Kitchen island with outletsA kitchen island for prep and seating.
  • Roll-in tile shower and tile bath floorA custom tile shower.
  • Extra windows
  • Kitchen cabinets 4 inches taller
  • ADA toilet with two flush buttons
  • Quarter-inch glass windows
  • Cat 6 network wiring throughout

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Glen Arden, our architect and engineers checked 250+ things before anything was designed.

Glen Arden’s FPA250+ checks
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Soil and foundation
  • Sewer line condition
  • Water meter size
  • Fire department rules

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Duchess

    Flooring

    Duchess

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Kitchen Farmhouse Sink

    Upgrade

    Kitchen Farmhouse Sink

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.