Navarro ADU

2 Bed
2 Bath
749 sqft
detached
Testimonial image
Gallery image
Gallery image
View gallery
View All
ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Navarro started as our Estate 750+ and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Exterior Scratch & Stucco
Exterior Scratch & Stucco
Week 7
Exterior Finishes
Exterior Finishes
Week 8
Cabinets & Countertops
Cabinets & Countertops
Week 9
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Longer utility runs: Backfilling the utility trench, Jul 16, 2026

Backfilling the utility trench, Jul 16, 2026

Longer utility runs

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Retaining foundation (3 feet high): Footings dug for the retaining foundation, Jul 17, 2026

Footings dug for the retaining foundation, Jul 17, 2026

Retaining foundation (3 feet high)

What we found during the FPA
The lot’s slope needed a retaining wall where the ADU sits.
How finding it early helped
Measuring the slope early let our engineer design the retaining wall together with the foundation, so the ground and the home were planned as one.
What it meant for this homeowner
Level ground under the ADU, and a yard that holds its shape.
Water meter upgrade: The existing water meter, at the FPA site visit, Oct 17, 2025

The existing water meter, at the FPA site visit, Oct 17, 2025

Water meter upgrade

What we found during the FPA
The water meter was too small to serve two homes.
How finding it early helped
Sizing the new meter at the start let the water district swap it while the ADU was still being built.
What it meant for this homeowner
Good water pressure in both homes, with no wait on the water district at move-in.
  • Concrete demo: Clearing the pad, Jul 17, 2026

    Clearing the pad, Jul 17, 2026

    Concrete demo

    Old concrete broken up and hauled away to make room for the ADU.

City permits and fees

Already included in every price, in every city we build in.

StepWho we work withFees we pay
Plan reviewPlanning, Building, Engineering, City / County Fire, CA ADU LawPlan-check, fire, corrections review, state compliance
UtilitiesPublic Works, Water, Electric Provider, WasteWater, sewer and electric connection and capacity
PermitSchool Districts, RecorderSchool, address, notarization, building, permit pull
InspectionsBuildingInspection

Added for this lot

  • Survey and topographyA licensed survey of the lot’s lines and levels, so the plans sit exactly where they should.
  • MEP plansCorona asks for engineered heating, wiring and plumbing drawings on top of our standard plans.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Tile roof at a 6:12 pitchTile to match the house, on a roof built to hold it.
  • TrimThe same window and door trim as the house.

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Navarro, our architect and engineers checked 250+ things before anything was designed.

Navarro’s FPA250+ checks
  • Slope and drainageRetaining wall designed with the homeFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Water meter sizeA bigger meter, set during the buildFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Soil and foundation
  • Sewer line condition
  • Electrical panel size
  • Fire department rules

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Oyster

    Flooring

    Oyster

  • Shaker Cabinets - Blue

    Cabinets

    Blue

  • Shaker Cabinets - White

    Cabinets

    White

  • Countertop - Calacatas River

    Countertops

    Calacatas River

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Cabinet Pulls - Satin Nickel

    Hardware

    Satin Nickel

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.