ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Murrietta started as our Estate 1200 and was customized for this home.

Project Timeline Overview

5 weeks

Plans

8 weeks

Permits

9 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Exterior Scratch & Stucco
Exterior Scratch & Stucco
Week 7
Cabinets & Countertops
Cabinets & Countertops
Week 8
Exterior & Interior Finishes
Exterior & Interior Finishes
Week 9
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Longer utility runs (293 feet): The utility trench, May 19, 2026

The utility trench, May 19, 2026

Longer utility runs (293 feet)

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Electrical panel upgrade: At the FPA site visit, Jan 21, 2026

At the FPA site visit, Jan 21, 2026

Electrical panel upgrade

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
Fire sprinklers: Sprinkler lines in another ADU we built

Sprinkler lines in another ADU we built

Fire sprinklers

What we found during the FPA
The fire department required sprinklers in the ADU.
How finding it early helped
Planning sprinklers from day one meant the water line, meter and ceilings were sized for them, and the fire department reviewed one complete design.
What it meant for this homeowner
No redesign after approval, and sprinklers that fit cleanly into the finished rooms.
Taller and deeper foundation footings: The footings, May 19, 2026

The footings, May 19, 2026

Taller and deeper foundation footings

What we found during the FPA
The ground called for taller or deeper footings.
How finding it early helped
Knowing the soil and slope up front, we set the footing depth and floor height in the plans, with steps and drainage that work with them.
What it meant for this homeowner
A level, solid foundation, with steps and drainage that fit the lot.
Soils report: Breaking ground, May 11, 2026

Breaking ground, May 11, 2026

Soils report

What we found during the FPA
The ground needed an engineer’s soil test before the foundation could be designed.
How finding it early helped
The soil report told our engineer how much weight this ground can hold, so the footings and steel were designed for this exact lot.
What it meant for this homeowner
A foundation built for this ground, with no redesign at inspection.
Sewer scope: On site, May 19, 2026

On site, May 19, 2026

Sewer scope

What we found during the FPA
The existing sewer line needed a camera check before the ADU could tie in.
How finding it early helped
The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
What it meant for this homeowner
A sewer line ready for two homes, and a finished yard left alone.
  • Driveway concrete cut and replaced (80 sq ft): At the driveway, May 19, 2026

    At the driveway, May 19, 2026

    Driveway concrete cut and replaced (80 sq ft)

    Concrete cut for the trench, then poured back.

  • Pavers removed and replaced for utility runs: Pavers going back down, Jul 13, 2026

    Pavers going back down, Jul 13, 2026

    Pavers removed and replaced for utility runs

    Pavers lifted for the trench and laid back down.

City permits and fees

Already included in every price, in every city we build in.

StepWho we work withFees we pay
Plan reviewPlanning, Building, Engineering, City / County Fire, CA ADU LawPlan-check, fire, corrections review, state compliance
UtilitiesPublic Works, Water, Electric Provider, WasteWater, sewer and electric connection and capacity
PermitSchool Districts, RecorderSchool, address, notarization, building, permit pull
InspectionsBuildingInspection

Added for this lot

  • Impact feesThis ADU is 1,200 sq ft. State law lets cities charge impact fees on ADUs 750 sq ft and up.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Tile roof to match the houseTile to match the house, on a roof built to hold it.
  • Stackstone accents to match the houseStone along the lower walls, like the house.
  • Foam trim around exterior windows

Plus the upgrades they chose

  • 10-foot ceilings with an 8-foot plate lineTaller ceilings for more open rooms.
  • Roll-in tile shower with glass door and nicheA custom tile shower.
  • Second bath: tile floors, glass door and niche
  • Kitchen backsplashA tiled kitchen backsplash.
  • Bullnose corners on interior wallsRounded wall corners.

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Murrietta, our architect and engineers checked 250+ things before anything was designed.

Murrietta’s FPA250+ checks
  • Soil and foundationFootings designed for this groundFound
  • Sewer line conditionLine checked before the tie-inFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound
  • Fire department rulesSprinklers planned from day oneFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Water meter size

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Oyster

    Flooring

    Oyster

  • Shaker Cabinets - Misty Gray

    Cabinets

    Misty Gray

  • Countertop - Calacatas Alaska

    Countertops

    Calacatas Alaska

  • Cabinet Pulls - Satin Nickel

    Hardware

    Satin Nickel

  • Kitchen Faucet - Satin Nickel

    Kitchen faucet

    Satin Nickel

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.