Somerset ADU

2 Bed
1 Bath
659 sqft
attached
Testimonial image
Gallery image
Gallery image
View gallery
View All
ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Somerset started as our Estate 600 and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Framing
Foundation & Framing
Week 3
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 4
Insulation & Drywall
Insulation & Drywall
Week 5
Interior & Exterior Finish
Interior & Exterior Finish
Week 6
Cabinets & Countertops
Cabinets & Countertops
Week 7
Interior & Exterior Touch-ups
Interior & Exterior Touch-ups
Week 8
Final Inspection
Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Fire-rated wall and stucco eaves on the ADU side: Stucco and eaves on the ADU, Jul 24, 2026

Stucco and eaves on the ADU, Jul 24, 2026

Fire-rated wall and stucco eaves on the ADU side

What we found during the FPA
The ADU sits close enough to the house or property line to need fire-rated walls, eaves and windows.
How finding it early helped
Measuring those distances first told us exactly which walls, eaves and windows needed fire ratings, so we kept the windows and light the design called for.
What it meant for this homeowner
A home built to fire code that still feels bright and open.
Taller footings and foundation: The foundation under the new walls, Jun 23, 2026

The foundation under the new walls, Jun 23, 2026

Taller footings and foundation

What we found during the FPA
The ground called for taller or deeper footings.
How finding it early helped
Knowing the soil and slope up front, we set the footing depth and floor height in the plans, with steps and drainage that work with them.
What it meant for this homeowner
A level, solid foundation, with steps and drainage that fit the lot.
Pool fencing: At the FPA site visit, Feb 6, 2026

At the FPA site visit, Feb 6, 2026

Pool fencing

What we found during the FPA
Pool safety rules applied once a new home was added to the lot.
How finding it early helped
We designed the fence and gates to those rules from the start, so they were part of the plan, not a fix at the end.
What it meant for this homeowner
A safe pool area, and a final inspection without a holdup.
Electrical load calculations: At the FPA site visit, Feb 6, 2026

At the FPA site visit, Feb 6, 2026

Electrical load calculations

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
Longer electrical run: At the FPA site visit, Feb 6, 2026

At the FPA site visit, Feb 6, 2026

Longer electrical run

What we found during the FPA
The power line had to run farther than usual to reach the ADU.
How finding it early helped
We measured the route and sized the wire for that distance, so the ADU gets full power at the far end of the run, not a weak supply.
What it meant for this homeowner
Full, steady power in the ADU from the first day.
  • Tile, concrete and wainscot replaced for utility runs: Concrete cut for the trench at one of our jobs

    Concrete cut for the trench at one of our jobs

    Tile, concrete and wainscot replaced for utility runs

    Concrete cut for the trench, then poured back.

  • Existing wall demolished: Rebuilding a block wall at one of our jobs

    Rebuilding a block wall at one of our jobs

    Existing wall demolished

    An existing wall taken down for the build.

  • Front tree trimmed and palm tree removed: First day of demo, Jun 15, 2026

    First day of demo, Jun 15, 2026

    Front tree trimmed and palm tree removed

  • 4-foot overhang at the front door: The finished overhang, Aug 10, 2026

    The finished overhang, Aug 10, 2026

    4-foot overhang at the front door

    A deeper roof overhang over the front door.

  • Tempered glass windows

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Tile roof to matchTile to match the house, on a roof built to hold it.
  • Foam window trim to match the front of the houseThe same window and door trim as the house.
  • GuttersGutters that keep rainwater away from both homes.

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Somerset, our architect and engineers checked 250+ things before anything was designed.

Somerset’s FPA250+ checks
  • Distance to the house and lot linesFire-rated, with the windows keptFound
  • Soil and foundationFooting depth set in the plansFound
  • Pool or spaFence and gates designed to codeFound
  • Utility run lengthsWire sized for the distanceFound
  • Electrical panel sizePower for both homes, planned earlyFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Sewer line condition
  • Water meter size
  • Fire department rules

And 230+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Malibu

    Flooring

    Malibu

  • Shaker Cabinets - White

    Cabinets

    White

  • Countertop - Calacatas Vega

    Countertops

    Calacatas Vega

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Cabinet Pulls - Satin Nickel

    Hardware

    Satin Nickel

  • Kitchen Faucet - Satin Nickel

    Kitchen faucet

    Satin Nickel

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.