Western ADU

2 Bed
1.5 Bath
749 sqft
detached
Testimonial video
Gallery image
Gallery image
View gallery
View All
Arneld & Shannon

Arneld & Shannon

HOMEOWNER

Arneld & Shannon

Arneld & Shannon

HOMEOWNER

We're the Parker family, and we decided to build an ADU because we wanted to give our daughter and her fiancé a great start to their future together.

We didn't want to see them continue to spend money on rent because it's so costly nowadays.

With their wedding coming up, we wanted them to have a place they could truly call home without the financial burden of today's expensive rental market. We didn't want to see them continue to spend money on rent because it's so costly nowadays. Instead, we wanted to help them get started on a path toward greater financial stability while keeping our family close.

For our daughter, it was about more than just having somewhere to live.

For our daughter, it was about more than just having somewhere to live. I decided to build an ADU to be closer to my family and to financially be in the best situation we could be in. She and her fiancé wanted a home base where they could begin their married life together, enjoy their independence, and still be surrounded by family.

When we started looking into ADU builders, Backyard Estates stood out for two important reasons: their experience building in Norco and their willingness to let us personalize the home.

They were able to show us the footprint of our property, where it would be placed, and we moved it around and played with different ideas.

From our very first meeting with Adam and Tom, we felt comfortable. They took the time to understand what we wanted and showed us exactly how an ADU could fit on our property. They were able to show us the footprint of our property, where it would be placed, and we moved it around and played with different ideas.

Being able to visualize the possibilities before construction even started made a huge difference.

I was able to work with the architect to design it in a way that had good energy flow, versus just a copy-and-paste space from another company.

One of the things we appreciated most was the freedom to customize the design. Our daughter is passionate about Feng Shui and wanted a home that felt balanced, welcoming, and thoughtfully arranged. Backyard Estates gave her the opportunity to work directly with the architect to create that feeling.

I was able to work with the architect to design it in a way that had good energy flow, versus just a copy-and-paste space from another company.

That flexibility was especially important to us. We weren't looking for just another standard floor plan. We wanted a home that reflected how our daughter and her fiancé actually wanted to live.

I felt comfortable with the people I was working with, so I didn't have any worries at all.

Throughout the project, we felt confident in the team and the process. Having experienced home construction before, we understood what was involved, but what made the difference was knowing we were working with people we trusted. I felt comfortable with the people I was working with, so I didn't have any worries at all.

It's very cool to be in the space that you saw on a screen and now in person, and it's really come to life.

Now that the ADU is nearly ready for move-in, seeing everything come together has been incredibly exciting.

It's very cool to be in the space that you saw on a screen and now in person, and it's really come to life.

The finished home is even more impressive than we imagined. The layout creates distinct areas that make the space feel much larger and more functional. There's a welcoming area for guests and an office, along with a separate, cozy living space and a beautiful primary bedroom and bathroom that almost feels like a spa.

It just feels like our living space, but also space for other people. I really like the flow of it.

What we love most is that the ADU gives our daughter and her fiancé the best of both worlds: a home of their own and the comfort of having family nearby.

We're excited for them to move in, start their next chapter together, and enjoy a space that was designed specifically for them.

It just feels like our living space, but also space for other people. I really like the flow of it.

Looking back, we're grateful that Backyard Estates helped us turn this vision into something real. From the initial planning and customization to the finished home, the team made the experience comfortable and straightforward.

They can make the process very easy for you. They're very helpful.

I would definitely recommend Backyard Estates to someone thinking about building an ADU.

They can make the process very easy for you. They're very helpful.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Western started as our Estate 750+ and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing
Framing
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Rough-Ins
Rough-Ins
Week 6
Exterior Lath
Exterior Lath
Week 7
Insulation
Insulation
Week 8
Drywall & Exterior Scratch
Drywall & Exterior Scratch
Week 9
Cabinets & Exterior Stucco
Cabinets & Exterior Stucco
Week 10
Tile & Interior Finishes
Tile & Interior Finishes
Week 11
Countertops & Final Inspection
Countertops & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Longer water, sewer and power lines: The utility route, marked, at the FPA site visit, Nov 17, 2025

The utility route, marked, at the FPA site visit, Nov 17, 2025

Longer water, sewer and power lines

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Electrical load calculations: At the FPA site visit, Nov 17, 2025

At the FPA site visit, Nov 17, 2025

Electrical load calculations

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
Sewer scope: A sewer cleanout at one of our jobs

A sewer cleanout at one of our jobs

Sewer scope

What we found during the FPA
The existing sewer line needed a camera check before the ADU could tie in.
How finding it early helped
The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
What it meant for this homeowner
A sewer line ready for two homes, and a finished yard left alone.
  • A separate water meter for the ADU: The existing water meter, at the FPA site visit, Nov 17, 2025

    The existing water meter, at the FPA site visit, Nov 17, 2025

    A separate water meter for the ADU

    A water meter of its own for the ADU, separate from the house.

  • Area drain: An area drain beside another ADU we built

    An area drain beside another ADU we built

    Area drain

    Drain lines and grading that carry rainwater away from both homes.

  • Old step taken out and replaced: Breaking up old concrete at one of our jobs

    Breaking up old concrete at one of our jobs

    Old step taken out and replaced

    An old step taken out and a new one built.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Tile roofTile to match the house, on a roof built to hold it.
  • Trim and sidingThe same style as the house, so they look like a set.

Plus the upgrades they chose

  • A second exterior door with a stoop and lightA second door to the outside, with its own light.
  • Kitchen tile backsplashA tiled kitchen backsplash.
  • Medicine cabinet
  • Wiring for pendant lights

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Western, our architect and engineers checked 250+ things before anything was designed.

Western’s FPA250+ checks
  • Sewer line conditionLine checked before the tie-inFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Soil and foundation
  • Water meter size
  • Fire department rules

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Countertop - Fantasy Gold

    Countertops

    Fantasy Gold

  • Door Handles - Satin Brass

    Hardware

    Satin Brass

  • Kitchen Faucet - Brushed Gold

    Kitchen faucet

    Brushed Gold

  • Kitchen Fireclay Sink

    Upgrade

    Kitchen Fireclay Sink

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.