ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Birkdale started as our Estate 950 and was customized for this home.

Project Timeline Overview

0 weeks

Plans

0 weeks

Permits

0 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Footings
Footings
Week 3
Foundation Forms & Plumbing
Foundation Forms & Plumbing
Week 4
Concrete Pour
Concrete Pour
Week 5
Framing & Rough-Ins
Framing & Rough-Ins
Week 6
Insulation & Drywall
Insulation & Drywall
Week 7
Exterior Scratch
Exterior Scratch
Week 8
Interior Paint
Interior Paint
Week 9
Cabinets
Cabinets
Week 10
Countertops, Tile & Trim
Countertops, Tile & Trim
Week 11
Exterior Paint & Final Touch-Ups
Exterior Paint & Final Touch-Ups

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Longer water, sewer, gas and power runs: The utility trench, Aug 4, 2026

The utility trench, Aug 4, 2026

Longer water, sewer, gas and power runs

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Electrical load calculations: At the FPA site visit, Apr 17, 2026

At the FPA site visit, Apr 17, 2026

Electrical load calculations

What we found during the FPA
The electrical panel had to power two homes.
How finding it early helped
Our load calculation showed what the panel could carry, so any upgrade and the utility’s scheduling started early, not after the walls went up.
What it meant for this homeowner
Power for both homes from day one, with no wait on the utility.
Pool safety fence and alarms: Pool safety fence installed, Oct 15, 2026

Pool safety fence installed, Oct 15, 2026

Pool safety fence and alarms

What we found during the FPA
Pool safety rules applied once a new home was added to the lot.
How finding it early helped
We designed the fence and gates to those rules from the start, so they were part of the plan, not a fix at the end.
What it meant for this homeowner
A safe pool area, and a final inspection without a holdup.
Fire flow test: A fire hydrant at one of our jobs

A fire hydrant at one of our jobs

Fire flow test

What we found during the FPA
The fire department needed a flow test of the nearest hydrant.
How finding it early helped
The result tells us right away if the fire department will require sprinklers, which changes the water line, the ceilings and the permit. So all of it was settled before the design.
What it meant for this homeowner
Plans that met the fire department’s rules from day one, with no late redesign.
Sewer scope: At the FPA site visit, Apr 17, 2026

At the FPA site visit, Apr 17, 2026

Sewer scope

What we found during the FPA
The existing sewer line needed a camera check before the ADU could tie in.
How finding it early helped
The camera showed the line’s condition before we connected, so any repair was planned in, not found under a new yard.
What it meant for this homeowner
A sewer line ready for two homes, and a finished yard left alone.
  • Drainage flow lines: An area drain beside another ADU we built

    An area drain beside another ADU we built

    Drainage flow lines

    Drain lines and grading that carry rainwater away from both homes.

  • Walkway and trench concrete cut and poured back: Pouring the new walk, Sep 2, 2026

    Pouring the new walk, Sep 2, 2026

    Walkway and trench concrete cut and poured back

    Concrete cut for the trench, then poured back.

City permits and fees

Already included in every price, in every city we build in.

StepWho we work withFees we pay
Plan reviewPlanning, Building, Engineering, City / County Fire, CA ADU LawPlan-check, fire, corrections review, state compliance
UtilitiesPublic Works, Water, Electric Provider, WasteWater, sewer and electric connection and capacity
PermitSchool Districts, RecorderSchool, address, notarization, building, permit pull
InspectionsBuildingInspection

Added for this lot

  • Impact feesThis ADU is 1,000 sq ft. State law lets cities charge impact fees on ADUs 750 sq ft and up.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Concrete tile roof at a 6:12 pitchTile to match the house, on a roof built to hold it.
  • Exterior trimThe same window and door trim as the house.
  • Rain guttersGutters that keep rainwater away from both homes.

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Mary CoonDirector of OperationsKeeps every step moving: permits, schedule, people.
    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Birkdale, our architect and engineers checked 250+ things before anything was designed.

Birkdale’s FPA250+ checks
  • Pool or spaFence and gates designed to codeFound
  • Sewer line conditionLine checked before the tie-inFound
  • Utility run lengthsRouted and sized before any diggingFound
  • Electrical panel sizePower for both homes, planned earlyFound
  • Fire department rulesFire rules met in the first designFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Soil and foundation
  • Water meter size

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Shaker Cabinets - Espresso

    Cabinets

    Espresso

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Door Handles - Satin Brass

    Hardware

    Satin Brass

  • Kitchen Farmhouse Sink

    Upgrade

    Kitchen Farmhouse Sink

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.