My name is Rich Losee, and I decided to build the ADU to give my son a place to live. He's not at this point able to afford rent. We visited apartments to see what kind of cost would be associated with renting one, and it was just way too much. So we started investigating ADUs.

We talked to one or two other ADU builders. Then I was at an intersection near your offices in Upland, and I saw a truck going through the intersection in front of me that said Backyard Estates. I said, well, I need to talk to those guys. So I called and got a very good feeling talking to Adam and Tom Gibson. They seemed concerned about what our issues were and what it is that we were trying to accomplish.

They seemed concerned about what our issues were and what it is that we were trying to accomplish.

We have a tree in the yard that we wanted to preserve. If we had put just a rectangular structure in there, it would have taken the tree out. But by customizing the design a little bit, the architect was able to make a space for that tree. The house just blends right in. Actually, that's pretty incredible. If we had gone with a pre-manufactured unit, the tree would have gone.

By customizing the design a little bit, the architect was able to make a space for that tree.

What was most impressive was the construction, led by Dusty. He was on top of everything. He came through, checked on the site and had his checklist. The crew who did the foundation was really, really good, and it was neat to see these guys working. They worked together, they knew what they were doing, and they worked as a team. That was very cool. The guy who did the stucco did a great job, and his team did a really nice job.

It's really been, to my surprise, an incredible experience. From ground break to now, it's been about nine and a half weeks, so it was done in nine weeks or so. That's pretty fabulous, and it's so well done.

It was done in nine weeks or so. That's pretty fabulous, and it's so well done.

There was still a significant amount of anxiety associated with it. Part of that is just that it's such a big task, a big job to do, and the other part is that it costs a lot of money. I feel like it was well spent in this case. When it was finished, I slept for a whole day afterwards. It was just a relief.

The way I expect to benefit most is the ability to travel. With this house, Tony will have his own space that he'll be responsible for. Now that it's completed, I can walk away for a week or a month at a time, and I'm looking forward to that.

Now that it's completed, I can walk away for a week or a month at a time, and I'm looking forward to that.

I would without hesitation recommend Backyard Estates because of the quality of the construction and the design, but also the sense of satisfaction and mental ease that I had working with Backyard.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Cadley started as our Estate 750 and was customized for this home.

Project Timeline Overview

11 weeks

Plans

9 weeks

Permits

11 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Interior Finish
Interior Finish
Week 7
Exterior Finish
Exterior Finish
Week 8
Cabinets
Cabinets
Week 9
Countertops
Countertops
Week 10
Interior Touch-ups
Interior Touch-ups
Week 11
Final Inspection
Final Inspection

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.
Inspired by this ADU?

Designed specifically for your property

With years of experience building ADUs across Southern California, we begin by carefully reviewing your property, local requirements, and long-term goals. From there, we outline realistic options so you can move forward with clarity and confidence.

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.