Claremont Heights ADU

2 Bed
2 Bath
749 sqft
detached
Play Jason's story about the Claremont Heights ADU
Estate 750+ ADU in Claremont, CA – photo 1 of 15
Estate 750+ ADU in Claremont, CA – photo 2 of 15
View all 15 photos of the Claremont Heights ADU
View All
Jason

Jason

HOMEOWNER

They laid everything out honestly, and that gave me the comfort to make the right decision.

Jason

Jason

HOMEOWNER

My name is Jason, and the main reason we decided to build an ADU was for our parents. As they get older, we wanted them close by so we could help take care of them while still giving them their own comfortable space.

We figured, Why not just go take a look? That visit changed everything.

For a long time, we talked about building an ADU, but it always felt like a huge project and a major investment. We kept putting it off until Backyard Estates hosted an open house nearby. We figured, Why not just go take a look?

That visit changed everything.

They were legitimate, honest, and their work was high quality.

One of my friends, who has experience in architecture and construction, came with me and was impressed by the quality. After visiting multiple open houses, we all came away with the same impression: They were legitimate, honest, and their work was high quality.

They laid everything out—how much it would cost, how the process would work, and ways to avoid unnecessary expenses.

One of my biggest concerns was our property itself. Because we're close to Foothill Boulevard, I knew there were likely a lot of rocks underground, and I worried about unexpected costs and complications. When we sat down with Adam and Tom, they addressed those concerns directly. They laid everything out—how much it would cost, how the process would work, and ways to avoid unnecessary expenses.

That transparency gave me confidence. It gave me the comfort to make the right decision.

Once construction started, I was impressed by how quickly everything moved.

Once construction started, I was impressed by how quickly everything moved. Within the first few days, I could already see major progress. The team worked efficiently, professionally, and always seemed to know exactly what needed to happen next.

Everything feels fresh, high quality, and thoughtfully built.

Now that the ADU is complete, I couldn't be happier with the result. Everything feels fresh, high quality, and thoughtfully built. We originally planned for our parents and in-laws to move in, but after seeing the finished product, now I’m thinking maybe I should move into it myself.

I’m very pleased with all the people involved. I have no complaints.

Overall, the experience exceeded our expectations. I’m very pleased with all the people involved. I have no complaints. If someone asked me whether they should build an ADU with Backyard Estates, my answer would be simple:

I would definitely recommend Backyard Estates.

ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Claremont Heights started as our Estate 750+ and was customized for this home.

Project Timeline Overview

9 weeks

Plans

26 weeks

Permits

8 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Interior & Exterior Finish
Interior & Exterior Finish
Week 7
Cabinets & Countertops
Cabinets & Countertops
Week 8
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.
Inspired by this ADU?

Designed specifically for your property

With years of experience building ADUs across Southern California, we begin by carefully reviewing your property, local requirements, and long-term goals. From there, we outline realistic options so you can move forward with clarity and confidence.

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Oyster

    Flooring

    Oyster

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Countertop - Calacatas Alaska

    Countertops

    Calacatas Alaska

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Cabinet Pulls - Satin Nickel

    Hardware

    Satin Nickel

  • Kitchen Faucet - Satin Nickel

    Kitchen faucet

    Satin Nickel

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.