Plumas ADU

2 Bed
2 Bath
800 sqft
detached
Estate 800 ADU in Walnut, CA – photo 1 of 20
Estate 800 ADU in Walnut, CA – photo 2 of 20
Estate 800 ADU in Walnut, CA – photo 3 of 20
View all 20 photos of the Plumas ADU
View All
ADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty SupportADU DesignArchitectural PlansStructural EngineeringTitle 24Civil EngineeringPlan Check FeesBuilding & Fire FeesWater & City FeesNotarizationCounty RecordingAgency CoordinationZoning VerificationProject ManagementCity InspectionsCertificate of OccupancyTurn-Key ConstructionPremium FinishesUtility ConnectionsWeekly UpdatesFinancingExterior DesignInterior DesignPre-ConstructionFinal WalkthroughWarranty Support

Designed to feel like home.

Plumas started as our Estate 800 and was customized for this home.

Project Timeline Overview

17 weeks

Plans

11 weeks

Permits

8 weeks

Construction
Week 1
Site Prep & Groundwork
Site Prep & Groundwork
Week 2
Foundation & Footings
Foundation & Footings
Week 3
Framing & Rough-Ins
Framing & Rough-Ins
Week 4
Windows, Doors & Exterior Shell
Windows, Doors & Exterior Shell
Week 5
Insulation & Drywall
Insulation & Drywall
Week 6
Interior & Exterior Finish
Interior & Exterior Finish
Week 7
Cabinets & Countertops
Cabinets & Countertops
Week 8
Interior Touch-ups & Final Inspection
Interior Touch-ups & Final Inspection

Site work on this lot

No surprises. Here’s why.

Our Formal Property Analysis found all of this before they signed.

Step 1 of 2

Found before we started

Our architect and engineers checked this lot before we designed anything. Finding these early is how we avoid surprises during the build.

Longer utility runs (39 feet): Utility lines in the trench at one of our jobs

Utility lines in the trench at one of our jobs

Longer utility runs (39 feet)

What we found during the FPA
Sewer, water and power lines had to run farther than usual.
How finding it early helped
We mapped the route and checked the sewer’s slope over that distance, then sized the pipe and wire for the length.
What it meant for this homeowner
The yard was dug once, and every line works the way it was planned.
Over-excavation and deeper footings: Footings formed before the pour, Oct 23, 2025

Footings formed before the pour, Oct 23, 2025

Over-excavation and deeper footings

What we found during the FPA
The soil under the ADU had to be dug out and packed down again before the foundation.
How finding it early helped
The soil findings set how deep to dig and how tight to pack it, so the dig, the compaction tests and the foundation were all in the plan from the start.
What it meant for this homeowner
A solid base under the home, with no stop for soil work in the middle of the build.
  • Sewer cleanout for an outdoor kitchen

City permits and fees

Already included in every price, in every city we build in.

StepWho we work withFees we pay
Plan reviewPlanning, Building, Engineering, City / County Fire, CA ADU LawPlan-check, fire, corrections review, state compliance
UtilitiesPublic Works, Water, Electric Provider, WasteWater, sewer and electric connection and capacity
PermitSchool Districts, RecorderSchool, address, notarization, building, permit pull
InspectionsBuildingInspection

Added for this lot

  • Impact feesThis ADU is 800 sq ft. State law lets cities charge impact fees on ADUs 750 sq ft and up.

Step 2 of 2

Finished to match the house

So the ADU looks like it belongs with the house.

The finished ADU
  • Tile roofTile to match the house, on a roof built to hold it.
  • Exterior designed to match the front house

Plus the upgrades they chose

  • Kitchen islandA kitchen island for prep and seating.
  • Double sink in the main bathroom
  • A full-size, standard-depth fridge

Our team

Your team, from first visit to move-in.

One team. Every step.

  1. Plan

    • Serge MayerHead ArchitectWalks your lot and draws your plans. Civil engineering and surveying background.
  2. Permits

    • Elsa TomasProject AdminYour updates and documents, in one place.
  3. Build

    • Tom GibsonDirector of Construction50+ years building. Sets how every ADU gets built.
    • Dusty GravattSenior Construction Mgr.Runs the job site and the crews.
    • Jose CervantesProject ManagerRuns your schedule from permit to move-in.
  4. Every step

    • Adam StewartPresident & FounderStands behind every build.
    • Edgar CureMarketing & Tech Mgr.Builds the tools that show you every number.

Formal Property Analysis (FPA)

Your lot has its own requirements. Find them before you build.

For Plumas, our architect and engineers checked 250+ things before anything was designed.

Plumas’s FPA250+ checks
  • Soil and foundationSoil dug out and recompactedFound
  • Utility run lengthsRouted and sized before any diggingFound

Also checked

  • Zoning and setbacks
  • Height and size limits
  • Slope and drainage
  • Sewer line condition
  • Water meter size
  • Electrical panel size
  • Fire department rules

And 240+ more on every lot

  • What your lot needs
  • A buildable solution
  • A proposal with no surprises
Book your FPA

$500, fully credited toward your build

Not ready? Start with a free office visit

Finishes in this home

Designed with purpose, finished with care.

Every finish and fixture is selected with intention.

  • Luxury Vinyl Plank - Malibu

    Flooring

    Malibu

  • Shaker Cabinets - Olive Green

    Cabinets

    Olive Green

  • Countertop - Calacatas Dorada

    Countertops

    Calacatas Dorada

  • Ceramic Tile - Bright White

    Shower tile

    Bright White

  • Fireclay Bathroom Sink

    Upgrade

    Fireclay Bathroom Sink

  • Kitchen Farmhouse Sink

    Upgrade

    Kitchen Farmhouse Sink

Projects with a similar approach

A selection of ADUs shaped by thoughtful planning, refined details, and spaces designed to live well.